PROCEDURES FOR APPLYING FOR A BUILDING
PERMIT
1)
Obtain a Wisconsin
Building Permit
Application from the Village Clerk.
2)
Fill out the Permit Application (follow the instructions
attached w/ permit application) & review CAUTIONARY STATEMENT TO
OWNERS OBTAINING BUILDING PERMITS (also
attached).
NOTE:
DWELLING CONTRACTOR
FINANCIAL RESPONSIBILITY.
Comm
5.31 No person may obtain a building permit for a one- or
two-
family dwelling unless the person holds a certification
issued by the department
as a
dwelling contractor financial responsibility certification or a
dwelling
contractor financial responsibility-restricted certification,
except as provided
under s. 101.654 (1) (b), Stats. Exempts an owner of a
dwelling who resides or
will
reside in the dwelling and who applies for a building permit to
perform
work
on the dwelling from obtaining a dwelling contractor financial
responsibility
certification.
Permits will not be accepted unless this card is presented
(if applicable).
Return Application, permit fees (to be determined), w/
submission of plans to Smrcina Inspections LLC.
PLAN SUBMITTAL;
REQUIRED BUILDING PLANS. At least 2 SETS of plans shall be
submitted. The required plans shall be legible and drawn to scale or
dimensioned and shall include the following:
PLOT PLAN/ EROSION CONTROL PLAN. (a) The plot plan shall show
the location of the dwelling and any other buildings, wells, surface
waters and disposal systems on site with respect to property lines.
The location of the non-tracking access roadway, as required under
s. Comm 21.125 (1) (c), shall be shown. For sites greater than 5
acres, the plot plan shall indicate the area of land-disturbing
activity within the site.
1
revised 5-7-05,
12-5-05, 12-21-05
(b) The plot plan shall show the direction of all slopes on
the site. Sectors
within the area of land disturbing activities shall be
designated and labeled on the plot plan in the appropriate slope
category: less than 12 % slope; 12 % to 20 % slope; and greater than
20 % slope. The plot plan shall indicate initial erosion
control measures as specified in s. Comm 21.125 based on
slopes existing immediately prior to building construction.
FLOOR PLANS.
Floor plans shall be provided for each floor. The size &
location of all rooms, doors, widows, structural features, exit
passageways & stairs shall be indicated. The location of
plumbing fixtures, chimneys, and heating and cooling appliances, and
when requested, a heating distribution layout shall be included.
Show Service panel location.
ELEVATIONS. The elevations shall contain information on the
exterior appearance of the building, indicate the location, size and
configuration of doors, windows, roof, chimneys, exterior grade,
footings and foundation walls, and include the type of exterior
materials.
FOOTING AND FOUNDATION PLANS. Size if foundation, pier pad
locations and size, beams, size of footings, stair location, egress
windows (if applicable), foundation wall height, basement floor
type/thickness, frost walls.
CROSS SECTION. Exterior grade elevation, footing and
foundation wall
sizes, drain tile system and types of materials (if
applicable per code), exterior wall construction identifying
materials used (including vapor barrier and insulation), roof
construction identifying materials used and spans (including
vapor barrier and insulation), floor construction identify
materials used and spans
(including insulation, if used).
A COMPLETED ENERGY WORKSHEET FORM.
*****SIGNED AND DATED*****
A COMPLETED WATER PIPE SIZING CALCULATION
WORKSHEET
ANY OTHER NECESSARY DATA OR CALCULATIONS TO SHOW
CODE COMPLIANCE.
2
Revised
5-7-05, 12-5-05, 12-21-05
3)
Plumbing must be done by appropriately
STATE CREDENTIALED CONTRACTOR.
4)
HVAC work must be done by
appropriately STATE CREDENTIALED
CONTRACTOR.
5)
PLUMBING- A building permit CANNOT be
issued until a sanitary permit has
been issued for any new or affected existing private onsite
wastewater treatment system.
(check w/ the county zoning & sanitation office) Send a
copy of the
Soil Test Report for review ( If Applicable ) and a copy of
the Sanitary Permit.
6)
Review & SIGN the Uniform
Notice to Permit Applicants served by the
Village of Ferryville Contracted Inspection
Agency (2 copies attached, sign one
& return to Smrcina Inspections LLC & keep the other for
your files.
NOTE: SEND DIRECTIONS/ MAP ON HOW TO GET TO THE JOB
SITE.